@manh_nguyen, you should be able to do it as outlined in the image shared below:
In the survey tab of your XLSForm:
Data entry as seen in Enketo: when date 2 is smaller than date 1
Data entry as seen in Enketo: when date 2 is equal to date 1
Data entry as seen in Enketo: when date 2 is greater than date 1
Reference XLSForm:
Constraint Date.xlsx (9.7 KB)